What is actually failing
A leaking shell is a different project from a dated finish. Assessment comes before any quote.


Resurfacing, tile and coping, equipment upgrades and decking are the four levers. Most remodels pull two of them.
Carson's figure
From $10,000.
What moves it
Adjust it for your yard
A starting point, with no supplied range. Carson gave a starting point for this work and no range to move through, so there is nothing here to invent. What it lands at depends on the list above, and that needs a visit.
These are starting points from Carson projects across the Omaha metro, not quotes. Material prices, site access and scope all move them. Every project gets a site-specific estimate after we have stood in the yard.

A leaking shell is a different project from a dated finish. Assessment comes before any quote.

Deck replacement is usually the largest single line. It is also the most visible improvement.

Cutting a ledge or a spillway into an existing shell costs more than building it originally would have.

Hauling out old concrete through a narrow gate adds labor. Sometimes a lot of it.

If the pad is fifteen years old, replacing it during the remodel avoids a separate call next summer.

Doing everything in one window costs substantially less than three separate mobilizations.
Tell us what you are planning and we will price it honestly.

The shell holds water, the plumbing passes a pressure test, and the layout still suits how you use the yard.
The structure is failing, the plumbing is shot, or the pool is in the wrong place for the way you live now.
Our assessment gives you the pressure test, the structural read and both numbers before you decide.

Building anywhere in the metro. Tell us where your yard is.

Ask us a remodel cost question
New coping and deck. It changes how the whole yard reads more than a new interior finish does.
Yes, though each shutdown carries its own mobilization. Interior and coping should go together.
Two to three weeks for interior work, four to eight for a full remodel with new deck.
Fall or winter for spring completion. Booking in May usually means missing part of the season.
Dramatically. A full remodel typically runs a third to a half of a new build.
Swipe to browse

An assessment gives you the structural read and a priced list before you commit to anything.