How a Carson Pool Project Runs
The stages of a pool project

First contact
Stage 1
A real conversation, not a form reply. We call or text the same day to understand the vision and the scope, and to get a consultation on the calendar.

Onsite consultation
Stage 2
About 30 minutes in your backyard. We walk access, grade, drainage, utilities, setbacks and sight lines from the house, and talk through how you actually want to use the space. A realistic budget range gets set here.

Design and proposal
Stage 3
A site plan and renderings of the project in your own yard, so nothing about the finished space is left to imagination. We revise until you can see your own life in the drawing, then price it by scope.
3D design rendering

Agreement and pre-construction
Stage 4
Selections are locked and the contract is signed. Carson files and pays for the pool permit, schedules licensed subcontractors and orders materials. You get a build schedule and a named point of contact before anyone shows up in the driveway.

Construction
Stage 5
Four phases, from staking the pool to putting the yard back together. Typically around six weeks, weather and inspections permitting.

Handoff and startup
Stage 6
The pool is filled, the water is balanced and the equipment is commissioned and tuned. We walk you through running it, hand off warranty documentation, and stay on if you want us to.
Stage one is a conversation. We answer the same day.

What is inside our number
Competitors commonly quote the pool and leave the yard, and the trades, for you to solve. Putting the yard back together is inside our scope.
- Excavation and haul-off
- The pool shell and its built-in features
- Drain tile around the pool
- Licensed electrical, bonding and gas
- Retaining walls where the grade needs them
- Concrete or paver decking
- Final grading and sod
- Irrigation repair and fence replacement
- Plant material and the finished yard
The phases of construction

Site Prep and Excavation
Phase 1
Access is established and protected, the pool is staked and laid out, and the hole is dug. Spoils are hauled or placed on site per plan.

Pool Shell
Phase 2
The structure goes in and is set true: walls, footings, base, and the built-in features like sun ledges, benches and steps. Drain tile around the pool is standard on every build.

Subcontractors and Decking
Phase 3
Licensed trades come through. The electrician bonds and wires the equipment, the plumber installs the waste line and connects the gas, and retaining walls and concrete or paver decking go in.

Pool Delivery and Yard Restoration
Phase 4
The interior finish is installed, the pool is filled, equipment is started, and the yard is put back: grading, sod, irrigation, fence replacement and plant material.
How the work gets delivered
Planning before the dig
Layout, equipment access, drainage, utilities, setbacks and the full material list are settled on paper before excavation starts. A problem solved in planning costs a phone call. The same problem found mid-build costs weeks.
Communication on a cadence
You have a named point of contact and a schedule from day one. Phase transitions, subcontractor days and anything that moves the timeline get communicated rather than discovered. Nobody should have to wonder why there is a truck in the driveway, or why there is not one.
Correct installation technique
Proper over-dig and compaction, footings around the perimeter, concrete locking the structural features, drain tile, bonded and code-compliant equipment, and properly bedded bases under every hardscape surface. None of it is visible on handover day. All of it is why the project still looks right in year ten.
Built to be cared for
We build with the next decade in mind: equipment left accessible for service, finishes that can be maintained, plantings sized for what they become. Then we stay, for service, liner replacement, cover work and landscape maintenance.

Our Omaha metro service area
Building anywhere in the metro. Tell us where your yard is.
Process questions

Ask us a process question
How long does the build take?
Construction typically runs around six weeks, plus roughly two weeks of tuning once the pool is full. Design and permitting come before that and usually take longer than the build itself.
What happens on the first visit?
About 30 minutes in the yard. We look at access, grade, drainage, utilities and setbacks, talk about how you want to use the space, and set a realistic budget range.
Will I see the design before I commit?
Yes. You get a site plan and renderings of your own yard, revised until they are right, with the proposal itemized by scope so you can see what each piece costs.
Can I use the renderings for my HOA?
Yes, that is one of the reasons we produce them. They are made to be submitted.
Who pulls the permit?
We do. Carson files and pays for the pool permit, and schedules the licensed trades and inspections.
Who is my point of contact?
One named person, assigned before work starts, along with the build schedule.
Is the yard put back when you are done?
Yes. Grading, sod, irrigation, fence and plant material are in our scope and in our number. It is the part most often missing from a competitor quote.
Builds in progress, and the drawings behind them
Swipe to browse →
Related services and guides
Swipe to browse

Start with a walk of your yard
About 30 minutes on site is what it takes to talk about your project honestly. We will call or text you the same day.