Shape complexity
Every corner and radius is more panels and more cutting. Rectangles genuinely cost less.

From $80,000
Plus $15,000 to $30,000 of site work: plumbing, electrical and putting the yard back when the pool is in. Starting point, not a quote.
Get a firm quote
Plan on a new liner every five to nine years. That is normal ownership rather than a fault, and it is the cheapest way to make an older pool look new again.
Carson's figure
From $80,000 for any pool type, plus $15,000 to $30,000 of site work.
What moves it
Adjust it for your yard
Carson quotes $15,000 to $30,000 for plumbing, electrical and putting the yard back. Drag to see either end.
Your estimate
$95,000
A floor. Scope takes it up from here.
These are starting points from Carson projects across the Omaha metro, not quotes. Material prices, site access and scope all move them. Every project gets a site-specific estimate after we have stood in the yard.

Every corner and radius is more panels and more cutting. Rectangles genuinely cost less.

A deep end means more excavation, more haul-off and more wall. Sport bottoms cost less than diving wells.

Tanning ledges and bench seating are worth building, and each one adds to the shell price.

Heavier gauge and premium patterns add a modest amount and buy real durability on steps.

A variable-speed pump, salt system and automation are all optional and all recommended.

Moving from concrete to pavers or bluestone can add more than the pool features did.
Tell us what you are planning and we will price it honestly.

Vinyl costs less to build and is more flexible in shape. Fiberglass costs more up front and saves the liner replacements.
Gunite costs considerably more and needs periodic resurfacing. It wins only when you need a shape vinyl cannot make.
Over twenty years the three shell types land closer together than the build prices suggest. Build cost is not the whole story.

Building anywhere in the metro. Tell us where your yard is.

Ask us a vinyl pool cost question
A compact rectangle with a basic concrete deck can land in the high fifties. Below that, something important is being left out.
Usually a low-to-mid four-figure job every ten to fifteen years. Budget for it from the start.
They do. Vinyl-over-steel steps and ledges add panels, floor work and liner complexity all at once.
Yes, and we will set base and drainage for it during the build so nothing gets torn up twice.
Almost always. Plumbing and gas cost far less while the pad and trenches are already open.
Swipe to browse

Send us your yard dimensions and we will show you the biggest pool that belongs in it.